/*++

Copyright (c) Microsoft Corporation.  All rights reserved.

    THIS CODE AND INFORMATION IS PROVIDED "AS IS" WITHOUT WARRANTY OF ANY
    KIND, EITHER EXPRESSED OR IMPLIED, INCLUDING BUT NOT LIMITED TO THE
    IMPLIED WARRANTIES OF MERCHANTABILITY AND/OR FITNESS FOR A PARTICULAR
    PURPOSE.

Module Name:

    testapp.c

Abstract:   

Original Author:

    Eliyas Yakub

Environment:

    User mode Win32 console application

Revision History:


--*/
#include <windows.h>
#include <winioctl.h>
#include <stdio.h>
#include <string.h>
#include <stdlib.h>

#define DRIVER_FUNC_INSTALL     0x01
#define DRIVER_FUNC_REMOVE      0x02
#define DRIVER_NAME       "trivial"

//
// function prototypes
//
BOOLEAN
SetupDriverName(
    PUCHAR DriverLocation
    );

BOOLEAN
ManageDriver(
    IN LPCTSTR  DriverName,
    IN LPCTSTR  ServiceName,
    IN USHORT   Function
    );

//
// Main function
//

VOID _cdecl main( ULONG argc, PCHAR argv[] )
{
    UCHAR driverLocation[8*MAX_PATH];   // Just make it long.  Doesn't have to be "safe"
    HANDLE hDevice;
    BOOLEAN r;
    DWORD   d;

    char * devicePath = "\\\\.\\Trivial";

    //
    // Get driver directory
    //
    if (argc > 1) {
        strcpy(driverLocation, argv[1]);
    } else {
        strcpy(driverLocation, ".");
        d = GetCurrentDirectory(MAX_PATH, driverLocation);
        if (d <= 0) {
            printf("Could not get current directory.\n");
            return;
        }
    }

    //
    // Setup full path to driver name.
    //
    if (!SetupDriverName(driverLocation)) {
        return;
    }

    //
    // Be sure driver (and service) are unloaded/removed.
    //
    printf("Be sure driver (and service) are unloaded/removed.\n");
    (void) ManageDriver (DRIVER_NAME, driverLocation, DRIVER_FUNC_REMOVE);

    //
    // Install driver.
    //
    printf("Install service and driver.\n");
    r = ManageDriver(DRIVER_NAME, driverLocation, DRIVER_FUNC_INSTALL);
    if (!r) {
            printf("Unable to install driver: %s\n", driverLocation);
            return;
    }

    //
    // Open newly installed driver.
    //
    printf("Open newly installed driver.\n");
    hDevice = CreateFile (  devicePath,
                            GENERIC_READ,
                            0,
                            NULL,
                            OPEN_EXISTING,
                            FILE_FLAG_OVERLAPPED,
                            NULL
                         );

    if (hDevice == INVALID_HANDLE_VALUE ){
        printf ("Error: CreatFile(%s) Failed : %d\n", devicePath, GetLastError());
        return;
    }

    //////////////////////////////////////////////////////////////////////////////////////
    // Here is where any code to work with the driver goes...






    //////////////////////////////////////////////////////////////////////////////////////

    //
    // Close driver
    //
    CloseHandle (hDevice);

    //
    // Unload the driver.  Ignore any errors.
    //
    ManageDriver(DRIVER_NAME,
                 driverLocation,
                 DRIVER_FUNC_REMOVE
                 );

    ExitProcess(1);
    
}

BOOLEAN
SetupDriverName(
    PUCHAR DriverLocation
    )
{
    HANDLE fileHandle;

    //
    // Setup path name to driver file.
    //
    strcat(DriverLocation, "\\");
    strcat(DriverLocation, DRIVER_NAME);
    strcat(DriverLocation, ".sys");

    //
    // Insure driver file is in the specified directory.
    //
    fileHandle = CreateFile (DriverLocation,
                             GENERIC_READ,
                             0,
                             NULL,
                             OPEN_EXISTING,
                             FILE_ATTRIBUTE_NORMAL,
                             NULL
                            );
    if (fileHandle == INVALID_HANDLE_VALUE) {
        printf("Driver: %s.SYS is not in the system directory. \n", DRIVER_NAME);
        return FALSE;
    }

    if (fileHandle) {
        CloseHandle(fileHandle);
    }

    return TRUE;
}

/////////////////////////////////////////////////////////////////////////////////////
//
// Manage Windows drivers via the Service Control Manager APIs
//
/////////////////////////////////////////////////////////////////////////////////////
BOOLEAN
InstallDriver(
    IN SC_HANDLE  SchSCManager,
    IN LPCTSTR    DriverName,
    IN LPCTSTR    ServiceExe
    );


BOOLEAN
RemoveDriver(
    IN SC_HANDLE  SchSCManager,
    IN LPCTSTR    DriverName
    );

BOOLEAN
StartDriver(
    IN SC_HANDLE  SchSCManager,
    IN LPCTSTR    DriverName
    );

BOOLEAN
StopDriver(
    IN SC_HANDLE  SchSCManager,
    IN LPCTSTR    DriverName
    );



BOOLEAN
InstallDriver(
    IN SC_HANDLE  SchSCManager,
    IN LPCTSTR    DriverName,
    IN LPCTSTR    ServiceExe
    )
{
    SC_HANDLE   schService;
    DWORD       err;

    //
    // NOTE: This creates an entry for a standalone driver. If this
    //       is modified for use with a driver that requires a Tag,
    //       Group, and/or Dependencies, it may be necessary to
    //       query the registry for existing driver information
    //       (in order to determine a unique Tag, etc.).
    //

    //
    // Create a new a service object.
    //

    schService = CreateService(SchSCManager,           // handle of service control manager database
                               DriverName,             // address of name of service to start
                               DriverName,             // address of display name
                               SERVICE_ALL_ACCESS,     // type of access to service
                               SERVICE_KERNEL_DRIVER,  // type of service
                               SERVICE_DEMAND_START,   // when to start service
                               SERVICE_ERROR_NORMAL,   // severity if service fails to start
                               ServiceExe,             // address of name of binary file
                               NULL,                   // service does not belong to a group
                               NULL,                   // no tag requested
                               NULL,                   // no dependency names
                               NULL,                   // use LocalSystem account
                               NULL                    // no password for service account
                               );

    if (schService == NULL) {
        err = GetLastError();
        if (err == ERROR_SERVICE_EXISTS) {
            return TRUE;            // Ignore.
        } else {
            printf("CreateService failed!  Error = %d \n", err );
            return FALSE;           // Failure.
        }
    }

    //
    // Close the service object.
    //
    if (schService) {
        CloseServiceHandle(schService);
    }

    return TRUE;                    // Success.
}

BOOLEAN
ManageDriver(
    IN LPCTSTR  DriverName,
    IN LPCTSTR  ServiceName,
    IN USHORT   Function
    )
{

    SC_HANDLE   schSCManager;

    BOOLEAN rCode = TRUE;

    //
    // Insure (somewhat) that the driver and service names are valid.
    //
    if (!DriverName || !ServiceName) {
        printf("Invalid Driver or Service provided to ManageDriver() \n");
        return FALSE;
    }

    //
    // Connect to the Service Control Manager and open the Services database.
    //
    schSCManager = OpenSCManager(NULL,                   // local machine
                                 NULL,                   // local database
                                 SC_MANAGER_ALL_ACCESS   // access required
                                 );

    if (!schSCManager) {
        printf("Open SC Manager failed! Error = %d \n", GetLastError());
        return FALSE;
    }

    //
    // Do the requested function.
    //
    switch( Function ) {

        case DRIVER_FUNC_INSTALL:
            //
            // Install the driver service.
            //
            if (InstallDriver(schSCManager, DriverName, ServiceName)) { 
                //
                // Start the driver service (i.e. start the driver).
                //
                rCode = StartDriver(schSCManager, DriverName);

            } else {
                rCode = FALSE;          // Indicate an error.
            }
            break;

        case DRIVER_FUNC_REMOVE:
            //
            // Stop the driver and remove the driver service.
            //
            StopDriver(schSCManager, DriverName);
            RemoveDriver(schSCManager, DriverName);

            rCode = TRUE;       // Ignore all errors.
            break;

        default:
            printf("Unknown ManageDriver() function. \n");
            rCode = FALSE;
            break;
    }

    //
    // Close handle to service control manager.
    //
    if (schSCManager) {
        CloseServiceHandle(schSCManager);
    }
    return rCode;
}

BOOLEAN
RemoveDriver(
    IN SC_HANDLE    SchSCManager,
    IN LPCTSTR      DriverName
    )
{
    SC_HANDLE   schService;
    BOOLEAN     rCode;
    DWORD       err;

    //
    // Open the handle to the existing service.
    //
    schService = OpenService(SchSCManager, DriverName, SERVICE_ALL_ACCESS);
    if (schService == NULL) {
        err = GetLastError();
        if (err != ERROR_SERVICE_DOES_NOT_EXIST && err != ERROR_SERVICE_NOT_ACTIVE)
        {
            printf("OpenService failed!  Error = %d \n", err);
        }
        return FALSE;           // Failure.
    }

    //
    // Mark the service for deletion from the service control manager database.
    //
    if (DeleteService(schService)) {
        rCode = TRUE;           // Success.
    } else {
        err = GetLastError();
        if (err != ERROR_SERVICE_DOES_NOT_EXIST && err != ERROR_SERVICE_NOT_ACTIVE)
        {
            printf("DeleteService failed!  Error = %d \n", err);
        }
        rCode = FALSE;          // Failure.
    }

    //
    // Close the service object.
    //
    if (schService) {
        CloseServiceHandle(schService);
    }

    return rCode;
}

BOOLEAN
StartDriver(
    IN SC_HANDLE    SchSCManager,
    IN LPCTSTR      DriverName
    )
{
    SC_HANDLE   schService;
    DWORD       err;

    //
    // Open the handle to the existing service.
    //
    schService = OpenService(SchSCManager, DriverName, SERVICE_ALL_ACCESS);
    if (schService == NULL) {
        printf("OpenService failed!  Error = %d \n", GetLastError());
        return FALSE;           // Failure.
    }

    //
    // Start the execution of the service (i.e. start the driver).
    //
    if (!StartService(schService, 0, NULL)) {

        err = GetLastError();
        if (err == ERROR_SERVICE_ALREADY_RUNNING) {
            return TRUE;        // Ignore.
        } else {
            printf("StartService failure! Error = %d \n", err );
            return FALSE;       // Failure.
        }

    }

    //
    // Close the service object.
    //
    if (schService) {
        CloseServiceHandle(schService);
    }

    return TRUE;
}

BOOLEAN
StopDriver(
    IN SC_HANDLE    SchSCManager,
    IN LPCTSTR      DriverName
    )
{
    BOOLEAN         rCode = TRUE;
    SC_HANDLE       schService;
    SERVICE_STATUS  serviceStatus;
    DWORD           err;

    //
    // Open the handle to the existing service.
    //
    schService = OpenService(SchSCManager, DriverName, SERVICE_ALL_ACCESS); 
    if (schService == NULL) {
        err = GetLastError();
        if (err != ERROR_SERVICE_DOES_NOT_EXIST && err != ERROR_SERVICE_NOT_ACTIVE)
        {
            printf("OpenService failed!  Error = %d \n", err);
        }
        return FALSE;
    }

    //
    // Request that the service stop.
    //
    if (ControlService(schService, SERVICE_CONTROL_STOP, &serviceStatus)) {
        rCode = TRUE;           // Success.
    } else {
        err = GetLastError();
        if (err != ERROR_SERVICE_DOES_NOT_EXIST && err != ERROR_SERVICE_NOT_ACTIVE)
        {
            printf("ControlService failed!  Error = %d \n", err);
        }
        rCode = FALSE;          // Failure.
    }

    //
    // Close the service object.
    //
    if (schService) {
        CloseServiceHandle (schService);
    }

    return rCode;
}

